History
Throughout recorded history, several cosmologies and cosmogonies have been proposed to account for observations of the universe. The earliest quantitative geocentric models were developed by the ancient Greek philosophers. Over the centuries, more precise observations and improved theories of gravity led to Copernicus's heliocentric model and the Newtonian model of the Solar System, respectively. Further improvements in astronomy led to the realization that the Solar System is embedded in a galaxy composed of billions of stars, the Milky Way, and that other galaxies exist outside it, as far as astronomical instruments can reach. Careful studies of the distribution of these galaxies and their spectral lines have led to much of modern cosmology. Discovery of the red shift and cosmic microwave background radiation revealed that the universe is expanding and apparently had a beginning.[
Space shuttle
The Space Shuttle was the first operational orbital spacecraft designed for reuse. It carried different payloads to low Earth orbit, provided crew rotation for the International Space Station (ISS), and performed servicing missions. The orbiter could also recover satellites and other payloads from orbit and return them to Earth. Each Shuttle was designed for a projected lifespan of 100 launches or ten years of operational life, although this was later extended. The person in charge of designing the STS was Maxime Faget, who had also overseen the Mercury, Gemini, and Apollo spacecraft designs. The crucial factor in the size and shape of the Shuttle Orbiter was the requirement that it be able to accommodate the largest planned commercial and military satellites, and have the cross-range recovery range to meet the requirement for classified USAF missions for a once-around abort from a launch to a polar orbit. Factors involved in opting for solid rockets and an expendable fuel tank included the desire of the Pentagon to obtain a high-capacity payload vehicle for satellite deployment, and the desire of the Nixon administration to reduce the costs of space exploration by developing a spacecraft with reusable components.
Each Space Shuttle is a reusable launch system that is composed of three main assemblies: the reusable Orbiter Vehicle (OV), the expendable external tank (ET), and the two reusable solid rocket boosters (SRBs).[19] Only the orbiter entered orbit shortly after the tank and boosters are jettisoned. The vehicle was launched vertically like a conventional rocket, and the orbiter glided to a horizontal landing like an airplane, after which it was refurbished for reuse. The SRBs parachuted to splashdown in the ocean where they were towed back to shore and refurbished for later shuttle missions.
Discovery rockets into orbit, seen here just after booster rocket (SRB) separation
Five space-worthy orbiters were built: Columbia (OV-102), Challenger (OV-099), Discovery (OV-103), Atlantis (OV-104), and Endeavour (OV-105). A mock-up, Inspiration (OV-100), currently stands at the entrance to the Astronaut Hall of Fame. An additional craft, Enterprise (OV-101), was not built for orbital space flight, and was used only for testing gliding and landing. Enterprise was originally intended to be made fully space-worthy after use for the approach and landing test (ALT) program, but it was found more economical to upgrade the structural test article STA-099 into orbiter Challenger (OV-099). Challenger disintegrated 73 seconds after launch in 1986, and Endeavour was built as a replacement for Challenger from structural spare components. Columbia broke apart during re-entry in 2003. Building Space Shuttle Endeavour cost about US$1.7 billion. One Space Shuttle launch costs around $450 million.[20]
Roger A. Pielke, Jr. has estimated that the Space Shuttle program has cost about US$170 billion (2008 dollars) through early 2008. This works out to an average cost per flight of about US$1.5 billion.[21] However, two missions were paid for by Germany, Spacelab D1 and D2 (D for Deutschland) with a payload control center in Oberpfaffenhofen, Germany.[22][23] D1 was the first time that control of a manned STS mission payload was not in U.S. hands.[6]
At times, the orbiter itself was referred to as the Space Shuttle. Technically, this was a slight misnomer, as the actual "Space Transportation System" (Space Shuttle) was the combination of the orbiter, the external tank, and the two solid rocket boosters. Combined, these were referred to as the "stack"; the components were assembled in the Vehicle Assembly Building, originally built to assemble the Apollo Saturn V rocket.
Responsibility for the shuttle components was spread among multiple NASA field centers. The Kennedy Space Center was responsible for launch, landing and turnaround operations for equatorial orbits (the only orbit profile actually used in the program), the US Air Force at the Vandenberg Air Force Base was responsible for launch, landing and turnaround operations for polar orbits (though this was never used), the Johnson Space Center served as the central point for all shuttle operations, the Marshall Space Flight Center was responsible for the main engines, external tank, and solid rocket boosters, the John C. Stennis Space Center handled main engine testing, and the Goddard Space Flight Center managed the global tracking network.[24]